Case Study - Applebee's

VASEY has approximately 100 roof top HVAC units and 400 pieces of refrigeration equipment (reach-ins, walk-ins, and ice machines) under service contracts. VASEY also implemented a comprehensive, custom Proactive/Preventive Maintenance Program.

Case Study - Toyota (Server Room)

The Toyota’s server room cooling system connected to production ceased operation. Consequently, the server was overheating. If left unattended the server would crash and production would come to a halt. VASEY received an emergency service.

Case Study - Bill Estes Automotive Dealership

Over the years, the dealership has made various changes to their facility. By eliminating a large awning and removing window tint from their showroom windows a significant increase in heat load was created.

Case Study - Northview Church

The existing HVAC (Heating, Ventilation, and Air Conditioning) system created problems for the customer for years. After experiencing a 40 below wind-chill event, the heating loop temperature struggled to reach 150 degrees.

Case Study - Plasma Centers

The allowable temperature window for storage is different for different facilities. It depends on where the plasma is going and how it is going to be used. Plasma shipped within the U.S. often has different regulations than that shipped outside the country.

Case Study - Toyota (Humidity)

Toyota Industrial Equipment installed an HVAC (Heating, Ventilation and Air Conditioning) package unit years ago above their paint booth. Given its proximity to the welding department, it couldn’t be serviced or cleaned and performed poorly based on specifications.

Case Study - Manufacturing Facility

VASEY obtained this client via a referral. The customer was not satisfied with their existing contractor. They wanted a price for maintenance on and repairs to their existing systems. They had already received one competitive bid.

Case Study - Toyota (Chiller)

A serious equipment failure occurred the day before Good Friday. Since Toyota’s chiller is on the production line, operating round-the-clock, downtime for repair or installation is never an option.

Case Study - Midwest Supplier

Serving the market for almost 115 years and covering approximately eight to ten Midwestern states, VASEY’s client manufacturers and provides wholesale equipment and supplies to both the industrial and the consumer markets.

Case Study - Package Right

The customer wanted to resurrect an abandoned building for expansion that contained two large steam boilers. Antiquated and inefficient heating coils and fans were located at various locations throughout the building.